Carbon Monoxide poisoning kills always use a Gas Safe registered installer it is for your Safety
Registered in England and Wales No 5463888
VAT Registration 902 8247 36
© 2010 Durham Heating Ltd

01388 815506
0759 1623466
For your no obligation quotation call:

The Baxi Platinum and Duo-
The Duo Tec was recognised as the best boiler by which magazine 2008 it comes with the following features.
• SEDBUK Band A rated -
•
• Stylish contemporary
design
• Easy to operate
• Separate temperature control for central heating and hot
water -

40 Kw
33 Kw
28 Kw
24 Kw
Baxi DT
Rating
£1965
£1885
£1765
£1625
Normal Price
Web Price
£1815
£1735
£1615
£1475
Scrappage Scheme
£400
£400
£400
£400
Final Price
Conditions apply *
£1415
£1335
£1215
£1075
Less £150
=
Less
Baxi
Duo
Tec

40 Kw
33 Kw
28 Kw
24 Kw
Baxi PL
Rating
£2155
£2025
£1895
£1765
Normal Price
Web Price
£1975
£1875
£1745
£1615
Scrappage Scheme
£400
£400
£400
£400
Final Price
Conditions apply *
£1575
£1475
£1345
£1215
Less £150
=
Less
Baxi
Platinum
• SEDBUK Band A rated -
•
• Stylish contemporary
design
• Easy to operate
• Separate temperature control for central heating and hot
water -
The Baxi Platinum
PLUS
Conditions -
•We reserve the right to change our prices depending on current market conditions and prices. Prices are correct at the time of web site publication however they can change at any time.
•Boiler Scrappage Scheme is subject to approval and qualification (CALL FOR FURTHER DETAILS)
•It includes condensate drain piping installation, all flushing and pacification, inhibitor chemicals and pipe work alterations at the boiler only.
•Prices are subject to Survey
•This offer is for a like location for location combination boiler swap only.
•For removal of gravity fed or back boiler system boilers, hot water cylinder, header tanks and piping modifications add an additional £275 + vat to the above prices.
•Any additional work required will be charged as such, prior to carrying out the work we will seek your approval to do so..
•Please also note that should the gas feed to your existing boiler be piped in 15
mm, to ensure correct operation of the boiler this will be required to be re-
•Our offer includes 2 metres of 22 mm pipe should additional be required it will be charge as extra work, we will notify you of this during the survey, we will NOT hide any additional costs prior to starting the work..
•Price includes VAT at current rate